Cooks Marine Services were the selected contractor to replace the existing dilapidated footbridge in Medmenham. Cooks managed the complete project in house, using the latest design software to demonstrate to the client the new footbridge how it will look. Cooks then fabricated the replacement bridge in their own workshop, using their skilled welders and craftsmen. The replacement bridge was manoeuvred into position using Cooks Mercedes Unimog U500. The client was very happy with the outcome of the new replacement bridge.
The old timber framed bridge was failing and causing a public safety hazard.
The new replacement bridge with a steel frame and made with marine hardwood for durability.